Posts by Erulasto

    I would choose Option 4. The Napping Neptune would arrive at 11:40pm thereby getting the passengers there in time for the connecting train, and we wouldn't have to pay a mechanic overtime to fix Jumping Jupiter.

    Option 1 would cost the most. $8,000 for the repair plus $30,000 for hotel costs, since it would not make Hicksburg in time to make the connecting train. Plus we would lose half the fares.

    Option 2 would cost us all the fares for the trip and be a PR disaster.

    Option 3 would allow Jumping Jupiter to reach Hicksburg in time to make the connecting train, but we would have to pay a mechanic overtime to fix the train. Additionally, there would be a minor PR problem having people wait the 90 minutes, even though the train could still arrive quicker than the Neptune. People who are travelling would rather be moving, than sitting still.

    Kid Costume Quantity Candies
    Greg Skeleton 10 oz Taffies
    Lucas Ghost 14 oz Bubble Gum
    Samantha Vampire 12 oz Lollipops
    Zoe Zombie 16 oz Jellies

    DE 304 Oktoberfest